Commodity: New Linde gas plant – AGA
Project challenges: Due to the height and length of some of the equipment, it was necessary to remove 4 elevated pedestrian crossings as well as various traffic lights and signs. Transportation from port Guayaquil to site had to be arranged at night to prevent traffic incidents and congestion.
Terms: Port to door
Year of execution: 2014
Volume: 3.240 m3
Weight: 1.677 metric tons
Heaviest piece: 98 tons
Longest piece: 35,60 meters